Transmission Survey in Dense Forest
Transmission lines carry electrical energy from the substation where it is produced to the numerous distribution systems and, finally, to customers. The effective power transfer methodology involves security, reliability, and other alternatives involved at the planning stage. Due to the vastness of the transmission network line runs through the open stretches, ponds, rivers, forests. However, doing transmission surveys in the dense forest is not an easy task, it comes up with a handful of situations that require a team of experts. The cost and route of transmission line projects are influenced by factors such as geography, channel bridges, power line crossings, and a variety of other obstacles
Here in this post, we will talk about the same.

Main Challenges Faced Doing Transmision Survey in Dense Forest
The right of way (ROW), land acquisition management, administrative, and environmental clearances for transmission lines are the most difficult issues facing the transmission sector today. Below we are going to cast light on the main issues faced doing surveys in the dense forest.
1. Needs Local Assistance: It is impossible to do survey & mapping of Transmission assets without needing assistance from locals. They are very well aware of the place so they can guide the team while doing surveys. It doesn’t matter if you have high-quality equipment but when it comes to doing surveys at Tiger Reserve Forest Area, you need to take assistance from locals.
2. Satellite Issue: Successful management and maintenance of power lines are needed to ensure that electricity is distributed without interruption. For that satellite or remote sensing, instruments are used to keep an eye on vegetation or power lines. But the major difficulty technical teams face is the quality data from the satellite. Due to the high amount of dense forest, it’s hard to capture data through Utility Asset Mapping, DGPS surveys and remote sensing via satellites. However, for uninterrupted monitoring, high-frequency instruments have been used at the time of the survey. But it still is a major concern among surveying teams.
3. Difficulty in Transportation: Lastly, the transportation issue is also the biggest challenge. The forest area is dense and rough which increases the chances of immobility. The area is covered with rough terrain and hill areas making it impossible to reach the survey site.
Overcoming the Transmission Challenges
Now coming to the points of how to overcome these transmission challenges or is there any healthy way of avoiding it? Of Course, there is a way we can avoid all these challenges. The very first thing we can do is hiring a team of experts that know the way to tackle all such challenges. If we plan the thing smartly and give consideration to each factor then doing transmission surveys in the dense forest is attainable. All it requires is proper resources, planning, implementation, execution, and a good team. We live in the age of technology where everything is possible.
Conclusion
That’s all! This is our take on the transmission survey in dense forests. Here we have mentioned all the challenges and solutions while doing surveys. It is a pressing need for a better understanding, knowledge, and implementation of cutting-edge technology, which can be a crucial enabler in tackling dynamic transmission problems. And that might be impossible if we are living under the rock but not in today’s world. CyberSWIFT is continuously working around a clock to ease the transmission survey and assisting clients with proper solutions.

Technical Consultant of Transmission Survey into helping Organisations all over the world manage and monitor all their Transmission Survey activities with more ease and transparency.