The primary objectives of the project included:
CyberSWIFT took up this project and executed it successfully.
The process of base map development was completed via the following methods:
Our field executives conducted GPS field surveys of the entire power network of WBSEB. The surveys included locating the power transformers, distribution transformers, EHV towers, HV and M&LV lines and poles, details of the consumers connected to these poles etc. The details of all existing electrical installations of the WBSEB was accumulated within an accuracy of 1 meter relative to the base map.
Single Line Diagrams (SLDs) were prepared to document the following:
This survey was conducted in 21 electric supplies and sectors.
The details of the consumers were accumulated through the following methods:
The process of digitization of the data collected included the following steps:
We also conducted training of WBSEB personnel to equip them with the knowledge of the software and the ability to operate and update it.
We delivered a comprehensive GIS-based digital database of the power network in certain areas of West Bengal along with the details of the consumers connected to it.